Port Canaveral, FL
March 9 – May 21, 2016
UMX was contracted to remove an 18’’ concrete pile and debris, which destroyed by a collision from a dredge barge at Port Canaveral FL. The pile was required to be extracted completely leaving no remains below the mud line. UMX provided a four-man dive team, which performed diving in depths up to 60’ of seawater.