UMX performed underwater services to remove 13 concrete tide gate structures measuring 26’ x 3’ x 28’ and two concrete wing walls. The structures were cut into smaller sections by core drilling and running a diamond wire cutting system. Cores were also cut though the structure for placement of rigging. UMX also placed articulating block mattresses along the embankments.
UMX provided the following services for this project:
Core Drilling holes 3’’ diameter up to 3’ in depth