Charlie 1 Wharf Repair

Project Info

Location

Naval Station Mayport (Jacksonville, FL)

Period of Performance

October 27 – November 13, 2016

Description of Work

UMX was contracted to make repairs to the concrete bull rail which required saw cutting 6’’ beyond damaged concrete, chipping a minimum of 1’’ around all exposed rebar, and prepping concrete for forming and pouring repair area with 6000psi marine-grade concrete mix. UMX also replaced the composite fender system (Sea Timber) and completed repairs to damaged piling and hardware.

UMX provided the following services for this project: