BAE Systems, Jacksonville, FL
March 21 – May 9, 2016
UMX provided a dive team, equipment and supervision to perform the emergency removal of sediment from beneath a 500’ x 120’ submersible drydock as well as dredging from a railway launch for deploying vessels. During this project, it is estimated that 7000 CY of material was removed and placed into Geotextile dewatering bags by use of hydraulic dredge pumps.